Place of Origin: | China |
---|---|
Brand Name: | ZhongYue |
Certification: | ISO9001:2015 |
Model Number: | E clip (e1809, e2006,e2007,e2009,etc) |
Minimum Order Quantity: | 10000pcs |
Price: | Negociable |
Packaging Details: | double-layer woven bag+free fumigation wooden pallet |
Delivery Time: | 10 to 30 days according to your order quantity after receiving advance payment |
Payment Terms: | T/T, 30% in advance |
Supply Ability: | 1000000PCS |
Product Name:: | High Strength Rail Clip And Rail Clamps With E Shape 60Si2MnA | Material:: | 60Si2CrA |
---|---|---|---|
Hardness: | 44-48HRC | Fatigue Life: | For Dia.18 Is 3 Millions Cycles Without Breaking |
Surface: | Plain (oiled), Oxide Black, Color Painting | Standard Refers: | DIN17221, BS970, GB/T1222 |
Railway Clip and Clamps - High Strength Rail Clip and Rail Clamps with E Shape 60Si2MnA
Rail elastic clip is used to fasten the rails to the underlying base plate together with the concrete sleeper. Usually rail clips are made of forged spring steel which is produced by hot forging process. Because of the uniform microstructure of forged clips, it is considered to be better than other metal forming process.
Our customers widely seek this product in the market attracted by the various salient features that are as follows:
For all types of elastic rail clips:
Rail clips processing procedures are as follow: Shearing-- Heating to forging temperature -- Forming-- Hardening—Tempering — Inspection — Packing.
Enriched with rich railway industrial experience, ZhongYue can offer its clients an extensive range of heavy duty rail fastening clips, made up of premium quality and seamless performance, to be used to fasten rails to underlying tie plates. The rail clips produced by ZhongYue are made up of premium grade spring steel sourced from a reliable and certified long term producer.
After over 10 years’ experience on producing rail elastic clips, ZhongYue has become the largest and most competitive production base of rail clips in China, qualified to tender nationally large and medium scaled rail projects under the China Ministry of Railways, both at home and abroad.
At each single step of manufacturing the clips are stringently tested and completely authenticated. To save time during installation in track, we can provide a special service by pre assembling a SKL clip with a T-bolt and a washer for the customer at our production base before delivery. Besides, corrosion protection layer of the clip surface can be applied.
For all types of rail clips:
Brand | ZHONGYUE | |||
Name | E clip | |||
Type | E clip (e1809, e2006,e2007,e2009,etc) | |||
Skl clip (skl1,skl3,skl12,skl14) | ||||
Or the type by customers’ drawings | ||||
Material | 60Si2MnA | 60Si2CrA | 55Si2Mn | 38Si7 |
Chemical composition(%) | C:0.56-0.64, Mn:0.60-0.90, Si:1.60-2.00, Cr:≤0.35, P:≤0.03, S:≤0.03 | C:0.56-0.64, Mn:0.40-0.70, Si:1.40-1.80,Cr:0.70-1.00 P:≤0.03, S:≤0.03 | C:0.52-0.60, Mn:0.60-0.90, Si:1.50-2.00,Cr:≤0.35 P:≤0.03, S:≤0.03 | C:0.35-0.42, Mn:0.50-0.80, Si:1.50-1.80, P:≤0.03, S:≤0.03 |
Hardness |
For e clip: 44-48HRC For skl clip: 42-47HRC |
|||
Fatigue life |
for Dia.18 is 3 millions cycles without breaking for Dia.20 is 5 millions cycles without breaking |
|||
Surface | plain (oiled), Oxide black, color painting | |||
Standard refers | DIN17221, BS970, GB/T1222 |
How do we produce rail clips?
ZhongYue produces the rail clips according the scientific procedures of rail clip production strictly and the specific procedures are as follow:
How is the quality control of ZhongYue rail clips?
We own a full set of strict quality control system to produce rail clips, from raw material purchasing till the finished clip application. There’s a professional inspection team to check about each process of the production line and every two hour out of the line.
Inspection machine for finished rail clips.
Zhongyue's products ranges: